Friday, March 27, 2015

Stairway To Heaven: The Final Saga

When I last wrote about the stairs, this is how they were looking, and I asked you kind readers to ignore what I had going on on the walls.


Well, you can ignore no more because I am going to tell you all about it.


The first thing that needed to be done was to cover the little half wall next to the stairs. I used 1x lumber to do this. Fortunately, our stairs are at a convenient 45 degree angle, so it made it easy to cut the ends of the boards to sit flush.


I did have to use a chisel to remove a tiny bit from the bottom corner of the treads to let the boards slide all the way against the stringer.


I also had a nice little gap underneath that I used my handy dandy plywood to cover. I just cut a 2" strip and nailed it in place. I also sanded down the edges of the risers with a power sander so that they were smoother and more flush with the stringer.


Once that was done, it was time to get started on a project I had been looking forward to for a long time. Square wainscotting on the stairwell wall. I used a 4x8 sheet of my plywood and cut it down into 4" strips. One sheet was enough for the whole project. I decided I wanted my squares to be 24" just by measuring and holding up wood on the wall.


I used a 1x4 board with a 1x2 on top of it to create a little shelf along the top, then just measured, cut, levelled, and nailed like crazy. I put up the border pieces first, then the horizontal pieces, then the vertical ones last.


I found it was difficult to accurately measure when a board intersected with the diagonal board. I got around this by cutting the 45 degree angle on one end, then holding the board up in place and marking where it needed to be cut.



Not all of my spacing is perfect and I did fudge a few areas to avoid having tiny little squares that would look weird. I don't think anyone would every notice though.


One problem I did run into was the light switches. The board just barely ran into the cover plate. So I boxed around the switches so they would all be sitting at the same level. I had to use spacers to push the switches out farther, but it was a simple fix.


It took me about 2 days to get all the strips on the wall.


Then I caulked and puttied like crazy. I covered all the nail holes, large knots, and seams with wood putty and ran a bead of caulk where the wood met the wall inside the squares.


Then it was time for painting, which Cait (from My Old Ky House) very graciously assisted me with.


So much painting. We covered the wood and the wall with 2 coats of white semi-gloss.


Then it was time to attach the bannister.


We used 3/8" dowel pins to attach the spindles to the half wall.


We purchased a newel attachment kit to make the newel post good and secure. These brackets will be covered by trim pieces that were included in the kit.


Then we trimmed down the old hand rail and screwed it into the newel post and the wall on each end as well as to each spindle.


We used the rest of the hand rail at the top of the stairs, where it is attached to the wall with handrail brackets.


And with that, we were done! And also ready for our final building inspection. Spoiler alert: it happened this morning and WE PASSED! Which means we are all done as far as the city is concerned and are free to move in furniture and use the space. We have a little bit of baseboard left to put up, then a very thorough cleaning is due before we start moving in. I have several fun decorating projects lined up that I can't wait to get to.

Thursday, March 26, 2015

A Post About A Post: Disguising A Basement Support Pole

Before I start talking about the support pole, I want to mention a little project I did that I am super thrilled with. I knew I wanted to put a cabinet in between the washer and dryer, but I also knew that a new cabinet in the size I needed from Lowe's was $85 and I really didn't want to pay that much. So I started hitting up the Habitat for Humanity ReStore a couple times a month and browsing their cabinet section. The first few times I came up empty handed, but then one day I found this guy:


It had an ugly paint treatment, but wasn't too dirty or broken like a lot of the cabinets. It also had slide out shelves in the bottom part. And only $10? YES, PLEASE. I couldn't get it to the register fast enough.


I applied two coats of paint, attached hardware (both paint and hardware match what is in the kitchen), then stained and poly'd a piece of leftover butcher block counter for the top.


Then we brought it downstairs, screwed it into the wall and attached the top.


Love it! And I saved $75, which is always a huge plus.


So about this column. There are several in the basement, but all of the others are hidden inside walls. We knew we wanted to wrap this one in wood to make it all nice and fancy.


To get the dimenions of the boards we would need, we measured this top plate, which was the largest part we needed to cover. Then we went out and bought 2 1x8's and 2 1x6's.

Then came the hard part, which was figuring out how to attach the thing. It was concrete on the bottom and metal and drywall on top, which wasn't exactly the best for attaching things to.


We started out by holding the boards in place around the column to see how much space we would have at the bottom. Then we cut some little pieces of wood to fit and screwed them into the floor with concrete anchors on two sides.


Then attached two of the boards with the nail gun. I also used wood glue and finish nails to attach the edges of the two boards.

We only used wood on two sides because the other sides of the pole had very lumpy concrete that we couldn't really attach anything to cleanly. Since all four boards would be attached to each other, the two supports were plenty.


Now when we got to this point we still had no idea what we were going to do to attach things at the top. We brain stormed for a while when we come up with the idea to insert spacers at the top.


We wedged them in on three sides and nailed them in place. They aren't actually secured to anything on the pole or header, but they keep everything so snug against the pole that there isn't any room for movement.


For the final board, we nailed the spacer onto the board and then attached it to the others.


After that, we placed a few clamps and let everything dry overnight.


The next night, we cut baseboard and shoe moulding and nailed them to the top and bottom of the column.


Then I caulked all the seams and gave everything a few coats of white semi-gloss and called it done. Not having that rusty pole hanging out down in the basement really makes the space feel a lot classier.

Also classing up the space are my stairs which are 100% done as of today. I'll have a post about that tomorrow so be sure to check back.

Wednesday, March 25, 2015

On Track! And Some Toilet Talk

Our Three Week Plan is in full swing and we are on track to complete right on time or maybe even a little early. The plumbers came last Tuesday and finished their work, then the final plumbing inspection was on Friday and we passed with no issue. The final electrical happened yesterday and we passed that as well. The building inspector actually called David today to check in on us and she let us know that all the trim and baseboards don't have to be finished for her to do her thing, so we may actually plan to have that inspection on Friday since all we need to do is put up the hand rail on the stairs.

We have finished work in the bedroom and bathroom and they are looking pretty snazzy, especially the bathroom which I like to walk into and just stand there gazing at it.



There were a couple of "special" items that I have lumped into the trim category in my mind that were a little more involved. The first one involves the stairs again, and I'll talk about that in another post when it's complete.

The second thing involved our specialty toilet system. To avoid having to jackhammer up the concrete floor and install plumbing, we opted to get an up-flush toilet system. Basically the shower, sink and toilet all drain into this pump which then pumps the waste up to a gravity drain line which then connects with our main sewer line. We wanted to install the pump behind the wall for aesthetic reasons, but we also wanted to be able to access it without tearing out drywall in case anything ever went wrong with it. 

Which meant I had to make a custom access panel. It was a lot of trial and error. I started out with a rectangle of plywood (the same plywood I have been using everywhere in this basement. This stuff is the bomb.com). Then I put casing all around it like a picture frame with wood glue.


Once that was dry, I had to make three holes for the various pipes and cords to come through. First, I lined it up on the wall to determine where the water line would come through. I used a paddle drill bit to make a hole. Later on, I realized that once the water line was actually connected to the toilet, that was no longer going to work. So I cut the trim off next to the hole I had drilled, so that I was left with a slot which allowed the panel to slide around the water line.

I took this picture before I realized my mistake about the water line.
Then I cut the whole thing right in two. I measured and marked where the hole needed to be for the main toilet drain pipe, clamped the two sides back together and used a hole saw to make my cut right where the two pieces met. This way, I could still take the panel off the wall once the pipe was in place. I also drilled a smaller hole in the same way for the power cord to come through.



Once the plumbers came and installed everything, it became apparent that the panel needed to be cut into three pieces so that it could slide behind the toilet tank and around the water line coming into the toilet, so I cut straight across one side of it, through the hole I had made for the water line.


After that it was just a matter of caulking and painting.



Then sliding everything in place. I secured each piece with a brad nail so that everything stays in place, but it will be easy to remove if we ever need to.

So if all goes smoothly, we will be getting our certificate of occupancy later this week, and then moving in furniture next week! Woo hoo!

Saturday, March 14, 2015

Kitchen Cart Turned Bathroom Vanity

Our basement bathroom is pretty sizeable. It's nothing you would pin onto your "Dream Home" Pinterest board, but it's quite a bit larger than our main upstairs bath. As such, I wanted a larger vanity that would fit the space. When I started looking around a while ago, I was shocked at how expensive bathroom vanities were. Everything in the size I was looking for was at least $400 so I started looking at alternative options.

I considered building one, but David had concerns that our craftsmanship would not be up to par and it would end up looking shoddy, which was a pretty valid concern, honestly. Then I started looking into antique dressers that I could convert, but again I ran into the "this is way more expensive that I thought" issue.


One day last November, we made a family trip up to Ikea and came across the Groland kitchen cart. It's solid wood with a butcher block top and just the size I was looking for. At $200, it wasn't cheap but still a savings over everything else I had seen, so we took one home.

And then it sat in our living room floor for 4 months. It seriously looks empty in there now without that big cardboard box.


As we were assembling everything, we left a few things out to accommodate our alternative use. First we left out the metal towel bars, as well as the top rear cross bar so we would be sure to have room for our faucet behind the sink. It has a lower support for the shelf so it is still very sturdy without that piece.

Then it was time to cut the sink hole. We were extremely nervous because we were using an undermount sink, which meant the cut out would be very visible and if we screwed up, our $200 investment would be ruined. In fact, I was so freaked out that I forgot to take any pictures of the next few steps, so you will have to use your imagination. We measured and considered and dry fit and etc. until we were fully satisfied that everything was aligned and that the sink and faucet wouldn't run into any edges or support pieces. We used the included template to trace the outline on the vanity top.

Then we drilled a hole at each corner of our traced outline that was large enough to fit the jigsaw blade into and I cut out the hole just inside the line. I went back over it again with the router and removed material until I reached the line. Then I used the belt sander to smooth things out.


Then we carried the top back downstairs and held up the sink underneath it and... it fit!


The hole is really not at all perfect. I would call it "rustic." But we did manage to not take a huge gouge out of it or make the hole too big so I call it a success.


After breathing a sigh of relief, I stained the whole thing after testing on the back to make sure I liked the color on this species of wood. I used the same color as the steps (Rustoleum Kona) which turned out really pretty on this wood. Then I remembered I needed to add a piece of wood to the front so you can't see the sink from underneath, so I cut that and nailed it to the front of the legs.


I followed up with polyurethane. I used one coat in the lower portion and three on the top surface, paying special attention to the sink opening. I realized after I was done that I should have used the Waterlox that we use on our butcher block in the kitchen. So down the road I might sand things down and refinish it if the poly doesn't hold up well.


Then it was time to attach the sink, which was pretty straightforward. We just used the included clips to hold it on and made sure to use plenty of silicone to seal it. We flipped the top upside down and installed the sink that way which made things so much easier, aside from having to lay on the floor underneath to make sure the sink was straight inside the opening. After we were satisfied with the sink, we attached the top of the vanity to the base.


Then we drilled the holes for the faucet. I thought we were going to have our first trip to the ER during this step, as the drill bit jammed and my wrist got twisted around by the drill with a lot of force. The pain subsided and I was able to move my hand again after a few minutes, so the crisis was averted. I did let David finish the drilling, though.


After this, I decided I really didn't like where I had placed the sink-covering piece of wood, so I pried it off, trimmed it down and reattached it between the legs. Much better.



Side note: notice the privacy film I applied over the window. Now no one has to worry about anyone peeping in through the ground level window while they pee!

So that is where we are now. David and I have devised what we are calling The Three Week Plan. We have the plumbers scheduled to come on Tuesday and finish connecting all the fixtures, then get their final inspection. The following week we will have the electrical inspector come to do his final inspection. By that point, we expect to have finished all our doors and trim and miscellaneous small items, so we will be ready to have the final building inspection the week after that. Here's hoping we can stick to the plan!

Friday, March 13, 2015

Stairway to Heaven Part 2: The Installation

It's been a little while, but once again we have been spending every free moment in the basement, so I haven't had time to update about our progress!

First of all, the stairs are installed and they are looking quite snazzy!


Removal of the old treads was pretty straightforward. David used a hammer to lift them up a few inches by hammering the bottom of them, then hammered them back down so that the nail heads were popped up.


Then he used a pry bar to pull out the nails. Sometimes, he had to repeat this process a couple times with each tread. It was a slow process, but uncomplicated.


Once all the treads were out, we used the framing nailer to secure the stringers (the long boards that the treads sit on) to the wall studs so they don't rattle against the wall when the stairs are walked on.

Then it was time for installation! We first attached the risers with a brad nailer, doing a couple of steps at a time.


Then we attached the treads, applying subfloor adhesive to each stringer to prevents squeaks first.


Then David pre-drilled holes, 2 in each stringer for a total of 6 per tread, and hand-nailed them into place. We could have used the nail gun, however, we went that route with the bathroom tub step and ended up splitting the tread. We didn't want a repeat of that, so we hand-nailed instead. We counter sunk all the nails and used a punch to drive them below the surface of the wood.

Before too long, we found that a lot of the risers were too tall, a result of my poor measuring skills. The saw was out in the garage, so we set all the treads in place and very carefully walked up them to trim down the wood.


Once we got that resolved, installation was pretty simple and before we knew it, they were all in place!


We waited a few days in case any nails decided to pop up after seeing some use, then I went over all the nails with stainable wood putty. After that was dried and sanded, I followed up with a coat of stain and polyurethane and we were all finished!


Pay no attention to all the wood on the wall. That's another project for another post. :)


Obviously, we still have some trim and caulking to do, but I plan to tackle that at the same time as the rest of the trim. You know I will update all of you on that step, too! In the meantime, I'm just thrilled to have some good looking steps to walk down.