Sunday, February 8, 2015

Tiling is the Worst Thing Ever: Part 1

I really need to stop thinking that anything in this basement isn't going to take a really long time. With the painting finished, David and I were free to move on to tiling and ceiling installation. Since tiling is something that requires big hunks of time, we saved it for the weekends while working on the ceiling during the weekday evenings. I'll talk about the ceiling in another post (it's not quite done yet) but the tiling is all finished up and I just barely lived to tell the tale.


We started with the shower subway tile. Before we kicked things off, we installed two of the bathroom lights so we could actually see what we were doing.


Flipping the switch for the first time and seeing the whole room light up was super exciting since up to this point we had been dragging a lamp around for light in here. However, the extra light illuminated some problematic drywall areas which we had to touch up.


I had never done any tiling before, so we watched some videos on YouTube and then dove in. See that line on the left hand wall in the above picture? That was my level line and I used it on all three walls to make sure my first row was nice and straight.


We used mastic instead of mortar in here and I really loved working with it. It's pre-mixed, which makes it super easy. Our tiles were also self-spacing so I just had to butt them right up next to each other.


Once I got the first row in place, things went pretty quickly. I placed all the tile while David made all the cuts with a manual tile cutter. I measured at the start of every row (starting in the center) to make sure my brick pattern wasn't getting off, and I also double checked that I was still level every few rows.


It took us all of Saturday and Sunday to get everything installed. We did run into some frustration with cutting weird shapes around the plumbing. We resigned ourselves to buying a cheap wet saw from Harbor Freight at that point which ended up coming in very handy later on, as well. Other than that, this was a very problem free installation and I was really excited to move on to the fireplace.


The next weekend, we got started again with these large 12"x24" tiles. Let's just say doing this area made me want to murder everyone. We had to used mortar here because mastic can only be used with tiles up to 12x12. The mortar was harder to work with than the mastic and we had to be sure to work quickly because it dried much faster too.

I had an awful time getting my grout lines straight with the spacers and also with making the tiles level with one another. Basically, I felt like it looked awful and I hated every minute of it. David also had a harder time cutting the much larger tiles. I can't imagine how much worse it would have been without the wet saw.


Doing the platform was a lot easier because we were able to measure and cut all our tiles in advance. Then it was just a matter of slapping them all down in place after mixing the mortar.


We had to figure out what to do with the ugly area where the tile meets the wall.  David had the brilliant idea of cutting thin strips of the tile and placing them on the wall, which worked out swimmingly.


Again, getting these tiles up took us all of Saturday and Sunday so grouting would have to wait another week.

Since this post is already rather long, I'll make another post about grouting. I was hopeful this step would go a little smoother after my frustration with the large tiles. Here's a hint: it didn't.

Friday, January 9, 2015

Say It, Don't Spray It

So once the drywall was all finished, it was time to get priming. The purpose of priming is to even out the color and texture for your paint, and also because bare drywall is very porous and sucks up paint like crazy.

I had purchased a pneumatic paint sprayer from Harbor Freight for about $15 to speed things along. With a paint sprayer, the first thing you want to do is cover up everything you don't want sprayed, like windows, bathtubs, built in bookshelves, etc.


I used plastic drop cloths and masking tape.

So remember how I said I got a paint sprayer so things would go faster? Yeah, about that...


This is about an hours worth of finagling with the sprayer. Then I gave up until David got home. He played with all the knobs for about 20 more minutes before he got it going. Whew.


It was a bit of a messy job, and I highly recommend wearing a mask if you are doing a lot of painting. I wore a dusk mask because that's all we had and I still had paint all up in my nose and mouth.

It took about 2 1/2 hours of work to get the whole basement primed, then we jumped in the shower and ran to a New Year's party, because, yes, we like to spray prime the basement at 8:30pm on New Year's Eve.


Then we were living in a world of white.


After the primer went on it made some less than stellar areas in our mudding much more apparent, so we reluctantly and with much dramatic sighing pulled out our mudding tools again and touched them up.


We also noticed some areas where the bare drywall had been roughed up during sanding which were sticking out like a sore thumb. A quick google search told us this was a pretty common problem with sprayed on primer and a little light sanding with fine grit paper would do the trick.


After our touched up mud had dried and been re-primed, it was time for paint. We at first used the sprayer for this, as well, but despite my best efforts to get good even coverage, there was still a lot of striping going on. So we went to the good old fashioned roller instead. The roller also helped a lot in covering any inconsistencies in texture, so I'm glad we went that route, even though it took a little longer.


I'm in love with the living room color. I stayed up until 2am on New Years deliberating over paint colors. It's called Grey Squirrel by Behr.


It's just the right mix of brown and grey and was exactly what I was going for.


The bedroom is Ashes by Behr and it admittedly looks a little like a prison right now. I used this same color in the upstairs office, so I know how nice it will look once we get some white ceiling and trim up.


The laundry and bathroom are Sparkling Sage by Valspar which is another color I've already used in the house.

After applying our final paint, there were still a couple areas where you can see edges from our mudding, but our attitude right now is pretty much, "No one's perfect and I'm too sick of this to fix it." If we ever get in the mood down the road, it will be easy enough to do later.

Some eagle eye readers might have noticed what we are working on now: ceiling and window trim. In the laundry room photo above, you can see we have the angle pieces for our drop ceiling up on the wall. We needed to do this because our ceiling will actually come down below the level of the windows, so we had to box things out a little.


Here's our freshly sprayed plywood pieces for the window, along with the bannister spindles, while I was at it (goodbye, golden oak!). This will all make more sense in my next post, hopefully. Stay tuned, things are finally starting to look more finished!

Thursday, January 8, 2015

Drywalling Til I Can Drywall No More

On the day after Thanksgiving, about 3,000 pounds of drywall and cement board was delivered to our carport.


After 36 trips up and down the stairs and about two and a half hours time, it was all carried downstairs.

Once we had recovered, we got started hanging it on the wall.


This step took quite a lot longer than I had anticipated. You never really think about how much area and how many little pieces of wall need to be covered by drywall until you get down to it. For anyone wondering, the green drywall on the bottom is mold and mildew resistant. We used it on the bottom half of all the walls and everywhere in the bathroom.

After a couple weeks, it was all up and then it was time for the dreaded task of mudding. We are far from experts at this, though we have vastly improved from our first efforts. We watched many a YouTube video on the subject.

In my previous post on drywalling, which goes into more detail on the step-by-step, I mention that I used the powdered mud that you mix yourself. This time around, we decided to go pre-mixed since having to mix up a new batch of mud all the time was going to slow things way down. In the end, I still prefer the mix-it-yourself mud, but for a large job like this, the convenience of pre-mixed wins.

While carrying those 12' sheets of drywall down the stairs, I was regretting my decision to go with them as opposed to the 8', but after  having to mud that many fewer seams, I was really glad we went for it. I just wished the green drywall came in 12' lengths, too.


We spent what felt like approximately 10,000 years applying three coats of mud, then sanding, then marking spots that need touching up, then sanding and touching up and so on. We found that shining a flashlight parallel with the wall was very helpful in finding any uneven spots.


Once we were finally satified enough with the smoothness of things, we put up the cement board in the areas we would be tiling.

Then it was on to the painting stage. That will be for another post though, since one is already plenty long enough. I can't even express how happy I am to be done with drywalling. Woo hoo!

Sunday, December 28, 2014

The Cat Box Box

Why, yes, we are still drywalling. It's been a month since we started on it and David and I are both soooooo very ready to be done with it. Fortunately, the end is in sight.


We have applied our final coat of mud and are just waiting for things to dry completely, make a few touch ups (you can see our markers as little dots of blue tape) and then it will be time for paint!

We did out semi-final sanding today (still have those wet spots and touch ups to do) and it was... dusty.
 

 Hopefully things will go a bit faster once we are on to painting. I am so jazzed to actually have some electrical outlets down there soon, instead of 500 extension cords strewn all over the floor! Then tiling! Then floor! And ceiling!

So anyway, the point of this post is to share a little project David and I did over Christmas. We have been wanting to find a way to hide at least one of the cat litter boxes both for aesthetics and also because the dog likes to *ahem* snack from it. We really liked the cabinet idea but not the price of a pre-made one, so when we found one that would work at Ikea a little while ago, we added it to our Christmas wish list.


This is what we chose. We liked it because it was the perfect size, doubled as a bench, and has a drawer that rolls out for easy cleaning.

So once we got it assembled, it was time to modify it.


We determined our hole size based on the size of our cat door. It was 8"x8". David used a jig saw to cut it out after I drew it on the outer portion of the bench.


Then we put the drawer in place and traced the opening onto it so we would be sure they lined up.


David cut that one out and we were in business. The cats were already very interested.



Then I just got some iron-on melamine edging from Lowe's and attached that to the rough edges.


I'll spare you a picture of the inside of the bench. Nobody wants to see that mess.


Eventually this will move down to the basement bathroom, but I wanted to go ahead and get the cats used to this new contraption, so I wasn't springing too many box changes on them at once.

Hopefully soon I'll be able to show off some pictures of my painted basement!

P.S. Check out my blog header - I updated with a more current picture. :)

Wednesday, December 3, 2014

It's Christmas Time!

Anyone that knows me knows that I love Christmas, especially when it comes to decorating. I had a big old Pinterest Fail a couple years ago when I tried to make one of those cute ornament wreaths, and since then I've been in need of something to spruce up the front door. I'd been looking around on Pinterest and was inspired when I saw a red burlap wreath. So off to Michaels and Home Depot I went.


Here's what I started out with. Red burlap from Michaels, an 8' section of pipe insulation from Home Depot. This is soooo much cheaper than buying a wreath form. This 8' section cost me $1.40 and it was enough to make two wreaths. The holly was from my holly tree outside, and a roll of duct tape that I already had.


The first thing you want to do it form your pipe insulation into a circle the size you want, cut it down to length (I used a kitchen knife) and then duct tape the ends into a circle.


Then I just wrapped my burlap around the wreath. I used sewing pins pushed right into the foam to hold the ends in place. Then I just started hot gluing the holly on in a pattern that I liked.


I hot glued a loop of twine-wrapped wire on top the hang it by, and pushed in a pin to keep the fabric from pulling away.


I also added a bow on, but I'm not sure if I'll end up keeping it or not.


The whole thing took about 30 minutes to complete and cost less than $4.00.

With the extra bit of pipe insulation that I had, I made a smaller wreath form and followed this super easy tutorial to make a coffee filter wreath.


I hung this one on the basement door by a velvet ribbon that I hot glued to the back of the wreath form and then duct taped to the back of the door.


I love the texture of this one and the best part is, I already had all the supplies so it cost me nothing.

So there you go, two Christmas wreaths for under $4.00! You can't beat that. Has anyone else been doing any Christmas crafting? I'd love to see it!

Wednesday, November 26, 2014

Inspector Gadget

When I last updated, we had finished our framing and were getting ready to start running our electrical. We knew this needed to be inspected, and shortly after that, the building inspector would come and give us the go-ahead for drywall. David and I were both really nervous about these inspections. We had never been through anything like it before, and we really didn't know what to expect. Would the inspector walk around and examine every little thing? Would they tell us we obviously didn't know what we were doing?


With these questions in mind, we ran all the electrical lines, and scheduled our inspection. Much like with the plumbing inspector, you have no time frame for when he/she will come, so David took off work for a day, and I anxiously checked my phone every 15 minutes from work. Well, the inspector came, took a look around (not inspecting every little thing) and not only did he not say we were idiots, we passed! Woo hoo!

After that, we knew we needed to put up the insulation for our next inspection. What we didn't know until David went to schedule the inspection was that we had to do what's called fireblocking. Neither of us had ever heard of this, and David had an hour long conversation with the building inspector trying to wrap his head around it. This curveball doubled our nerves for the inspection and pretty much took away all our confidence. We spent the night reading online and watching YouTube videos about the process and by the time we went to bed, we felt a little better about the whole thing.


Basically, you are making separations to slow the spread of fires through walls and between floors. There are several approved materials, but what we used was fireblocking spray foam, unfaced fiberglass insulation, and 1/2" drywall. We did most of our work over the weekend, then David took some pictures of what we had done to the building inspector's office to make sure we were on the right track. They had a few things we needed to change, but otherwise we were looking good.


You can see above where the wall was not flush with the cinder block, we used drywall to make our separation every 10' and unfaced insulation at the top to separate between floors.

After that was done, we put up our insulation on all the exterior walls, making sure to leave any fireblocked areas exposed for inspection.

We had our inspection this afternoon. She looked at the framing, fireblocking, insulation, etc., as well as making sure certain things were meeting code, such as smoke detectors and the size of our egress window in the bedroom. She also made sure we had our plumbing and electrical rough-ins approved. I was fully prepared to get the big old "You obviously don't know what you are doing." but instead we got a big old "This looks great!" I could hardly believe it.


So I got started finishing the insulation in the areas where I had left things exposed.


Things are definitely looking more room-tastic!


We have a little bit of HVAC venting to tinker with, then we will be on to drywall. I just placed our order from Lowes, and since we will be needing just over 2,000 pounds of drywall and cement board, we are having it delivered. Keep your fingers crossed that the delivery men carry it downstairs for us!